BNR From an Operator’s Perspective (AWBT)
Price range: $95 through $115
The purpose of this course is to prepare operators for BNR operations in an activated sludge system
CourseID:PA #10034 (3 hours Wastewater)
Category:Operations
This course is intended to help prepare operators for BNR operations in an activated sludge system. Topics covered include nitrification and denitrification, Bio-P removal versus Chemical-P removal, biological phosphorus and total nitrogen removal treatment plant designs, and options for enhancing BNR at existing treatment plants that were not originally designed for BNR.

